棋牌现金游戏送彩金

SL / T179-2019 Small Hydropower Station Preliminary Design Report Preparation Rules.pdf

Data evaluation:
★★★ ☆☆
Updated:
2020-01-09
Download requirements:
registered member
Document size:
34.13 MB
Authorization:
Sharing information
download times:
Upload Member:
Netizen upload
Document type:
.pdf
Belongs to the column:
Atlas of Water Resources Standards
Need Gold Coins:
3
Data language:
Simplified Chinese
Announcement: Free registered members can get gold coins immediately. For more ways to earn gold coins, please see: Download Gold Coin Description
Brief introduction of the data: 1.0.1 This standard is formulated to regulate the preparation principles, work content and work depth of the preliminary design report for small hydropower stations. 1.0.2 This standard is applicable to newly built, rebuilt and expanded small hydropower stations with installed capacity of 5-50MW. Small hydropower stations with installed capacity less than SMW and small hydropower stations belonging to large and medium-sized comprehensive utilization projects can be implemented by reference. 1.0.3 The preparation of the preliminary design report shall be based on the approved design documents of the previous stage, and shall implement the national policies and policies, comply with relevant technical standards, conduct necessary investigations, surveys, tests and studies, and obtain reliable basic information. Design technical solutions. The design should be tailored to local conditions, safe and reliable, advanced in technology, energy saving and environmental protection, and investment saving, focusing on technological innovation, and adopting new technologies actively and prudently.
Help Center Collection >>>
SL / T179-2019 Small Hydropower Station Preliminary Design Report Compilation Rules Download
Click here to download